![]() |
|||||||||||||||
|
River Center Branch Library Feasibility Study ![]() At the regular meeting of the Library Board of Control on August 20, 2009 Trahan Architects presented the results of a feasibility study on renovating the River Center Branch Library. A link to the presentation is provided below. Library Director, David Farrar, invites the public to comment on the study. River Center Branch Feasibility Study Key Points Comments and questions regarding the Downtown Branch Library will be taken through Friday, October 9, 2009. Comments can be sent to DowntownBranchLibraryInput@ebr.lib.la.us. |
||||||||||||||
|
Contact Us
•Feedback
•Report a Broken
Link |
||||||||||||||
Site maintained by the East Baton Rouge Parish Library
This page was last updated on Thursday, 14-Jan-2010 14:12:44 CST.